What we do for landowners
Highest and best use analysis
Zoning, future land use, density, utilities, access and market demand, evaluated together to determine what the site is worth and to whom.
Entitlement strategy
Coordination with land-use counsel, planners and engineers to position the site for approvals, with a clear view of which approvals add value before a sale and which are better left to the buyer.
Assemblage
Quietly acquiring adjacent parcels to create a developable site, including owner outreach, option structures and confidentiality.
Disposition
Marketing to the developers, builders and capital partners active in the asset class, with offering materials that present the site the way a sponsor underwrites it.
Development scenarios we evaluate
- Existing zoning versus proposed use. What the current zoning permits by right, what a different use would require, and the time and cost of getting there.
- Sale before or after entitlements. Approved sites usually command a premium, but entitlements take time and money and can narrow the buyer pool. We model both paths.
- Assemblage opportunities. Whether combining adjacent parcels changes the achievable program, and how to approach neighboring owners.
- Infrastructure and access constraints. Water, sewer, drainage, roadway access and turn restrictions that determine feasibility as much as zoning does.
- Development feasibility. A sponsor's view of the site: achievable density, likely product, cost, absorption and the residual land value that results.
- Buyer and developer positioning. Which sponsors are active in the product type and submarket, and how to present the site to them.
Technical considerations
Zoning versus future land use
The zoning district controls today; the comprehensive plan's future land use designation controls what can be rezoned to. Both matter.
Permitted use versus discretionary approvals
Uses allowed by right move on an administrative timeline; rezonings, special exceptions and plan amendments are discretionary public decisions.
Density and intensity
Units per acre, floor area ratio, height and setbacks set the program; bonuses and overlays can change it.
Utilities and access
Capacity letters, impact fees, concurrency and driveway permits are confirmed, not assumed.
Environmental and physical constraints
Wetlands, flood zones, soils, contamination and protected species can reshape the buildable area.
Approval status and transferability
Whether existing approvals run with the land, when they expire, and what conditions attach.
How we work a land assignment
- 1
Site review
Title, zoning, future land use, utilities, access, environmental and market data assembled into a highest-and-best-use view.
- 2
Decision point: path to market
Sell as-is, pursue approvals first, or assemble. We present the risk-adjusted outcome of each and the owner decides.
- 3
Preparation
Offering materials built the way a sponsor underwrites, with the due-diligence file organized in advance.
- 4
Marketing and buyer qualification
Targeted outreach to developers, builders and capital active in the product type; sponsors qualified on track record and capital.
- 5
Contract, diligence and closing
Inspection periods, approval contingencies and closing structured so the owner is not carrying the buyer's risk indefinitely.
Questions


